
Full renovation estimator
Chapter-based estimate (indicative US $/m²) for a first range. Not a binding offer.
Purchase quantity
753.474 ft²
Net measurement: 753.474 ft²
- Demolition & debris removal4760 $
- Masonry11900 $
- Plumbing & electrical14700 $
- Tiling & flooring12600 $
- Painting3430 $
Indicative estimate: $47,390.00
Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →
How it's calculated (visible formula)
total = Σ(area × $/m² per chapter)
- Net geometric measurement, no waste.
- Adjustable waste % for cuts and breakage.
- Purchase rounded up to sellable units (boxes, bags, buckets, boards).
Worked example: 1,000 sq ft home
- 5 chapters × $/m²
- Sum ≈ range
→ Indicative range + recommended 10% contingency.
Common mistakes
- Taking the range as a fixed price.
- Forgetting permits and contingency.
From calculation to quote
Add labour, overhead and your margin, and generate the professional PDF.
FAQs
- What does a home renovation cost?
- It depends on finishes and scope; this tool gives a chapter range to compare before a real survey.
- What does it cost to build per square foot?
- As an indicative range by chapter and finishes (see indicative prices). For your case, estimate with your area.
- What does a home renovation cost per square foot?
- As an indicative chapter range (see indicative prices). For your case, enter your area in the estimator.
- What does a bathroom remodel cost?
- It depends on finishes and plumbing. Estimate by chapter and compare with the indicative range.
- What does a kitchen remodel cost?
- Cabinets and appliances drive it. The estimator gives the base construction range.
- What does it cost to paint a house?
- Measure wall area with the area calculator and apply coverage × coats; add your labor.
- Does the range include permits?
- No: add permits plus a recommended 10% contingency on top.
- Can I enter square feet?
- Yes — switch to Imperial: a 70 m² home shows as ≈753 sq ft.
Maintained by Srikanta M · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.