Purchase quantity

4.12 yd³

Net measurement: 3.924 yd³ · Waste 5 %

  • Cement38 bag
  • Sand2.472 yd³
  • Gravel2.884 yd³
  • Water (indicative)142.653 gal

Ready-mix or bags? At this volume: ready-mix truck.

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labor, margin & tax

Shopping list

What to buy for this calculation. Look up each material at your store.

How it's calculated (visible formula)

cement = V × kg/m³; aggregates = V × m³/m³; all × (1+waste)

See methodology and formula versions

Reference mix per m³ (adjust on site)

Reference mix per m³ (adjust on site)
MaterialPer m³
Cement300 kg (12 × 25 kg bags)
Sand0.6 m³
Gravel0.7 m³
Water≈180 l
Quikrete / Sakrete bag yield80 lb ≈ 0.6 ft³ (≈17 l); 60 lb ≈ 0.45 ft³ (≈13 l); 40 lb ≈ 0.3 ft³ (≈8.5 l)

Worked example: 3 m³

  1. Cement: 900 kg → 36 × 25 kg bags
  2. Sand: 1.8 m³; gravel: 2.1 m³

→ See breakdown with waste applied.

Common mistakes

From calculation to quote

Add labor, overhead and your margin, and generate the professional PDF.

FAQs

Valid for structural concrete?
Not as final dosage: get it from the engineer or the plant.
How much cement per cubic yard of concrete?
About 230 kg (≈510 lb, roughly 10 × 50 lb bags) at reference dosage. Design dosage comes from the engineer.
How much sand and gravel per yard?
About 0.6 m³ sand and 0.7 m³ gravel per m³ of concrete (≈0.6/0.7 yd³ per yd³), plus waste.
How many cement bags for 4 cubic yards?
4 yd³ ≈ 3.05 m³ → about 915 kg net: 37 × 25 kg bags, plus waste.
How much water per yard?
About 180 l per m³ (≈36 gal/yd³) as reference. Never a substitute for design dosage.
Can I get cubic yards and pounds?
Yes — switch to Imperial: 1 m³ shows as ≈1.31 yd³ and 300 kg of cement as ≈660 lb.

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.