Concrete calculator

Concrete calculator

Geometric m³ for slabs, strip footings, round columns, walls, solid stairs, ramps, round slabs or ring footings. Pick the shape above; quantity estimation — structural sizing is signed by a qualified professional.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

3.21 m³

Net measurement: 3 m³ · Waste 7 %

  • Net concrete3 m³
  • Concrete to order (with waste)3.21 m³

Ready-mix or bags? At this volume: ready-mix truck.

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

How it's calculated (visible formula)

slab V=l×w×t; footing V=l×w×d; column V=πr²h; wall V=l×h×t; stairs V=n×(tread×riser/2)×w; ramp V=(l×h/2)×w; round V=πr²×t; ring V=π(R²−r²)×h; order = V×(1+waste)

See methodology and formula versions

Ready-mix or bags? (guide)

Ready-mix or bags? (guide)
VolumeRecommendation
Under 0.5 m³ (~20 bags)Bags (mix on site)
0.5–1 m³ (20–39 bags)Bags; price a short load to compare
1–2 m³Price both: bags vs short-load ready-mix
Over 2 m³Ready-mix truck (order extra; pump if needed)

Worked example: 5×4×0.15 slab

  1. V = 3 m³
  2. +7% → 3.21 m³

→ Order 3.5 m³ from the plant (round up).

Common mistakes

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

Ready-mix or site-mixed?
Above ~1–2 m³ ready-mix usually pays off in consistency; this page estimates volume either way.
How many 50 kg bags in 1 m³?
A 50 kg bag yields ~26 l: 1 m³ needs about 39 bags. That's why above ~1 m³ it's worth pricing ready-mix.
Rebar included?
No: this calculator only cubes concrete.
Does it handle footings, stairs and ramps?
Yes — choose the shape above: strip footing, stairs by steps, ramp by length and rise, round slab by diameter, or ring by diameters.

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.