Skip to content
Estimetra
Create quoteSign in
Offline — the draft stays saved on this device.
Framing & screws calculator

Framing & screws calculator

Tracks, studs, screws and compound for a basic partition, with visible adjustable assumptions.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

10 m²

Net measurement: 10 m² · Waste 5 %

  • Tracks 48/30 (3 m)3 unit
  • Studs 46 (h = height)8 unit
  • Board-to-metal screws1 box
  • Joint compound1 bag

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

Shopping list

What to buy for this calculation. Look up each material at your store.

How it's calculated (visible formula)

tracks = ceil(2L ÷ 3); studs = floor(L ÷ spacing) + 1; screws ≈ 25 × m²

See methodology and formula versions

Worked example: 4 m × 2.5 m partition

  1. Area 10 m²
  2. Tracks: ceil(8/3) = 3
  3. Studs at 0.6 m: 7

→ 3 tracks, 7–8 studs, ~250 screws, ~5 kg compound.

Common mistakes

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

Is the screw count exact?
It's indicative (~25 pcs/m² single layer). Double layer or fire boards need more; confirm with your supplier.
How many studs for a 13 ft wall?
Every 16 in plus a starter: about 11 studs for 13 ft.
How many tracks do I need?
Twice the wall length (floor + ceiling) divided by track length, rounded up.
Can I enter feet?
Yes — switch to Imperial above the form. A 10 m² partition shows as ≈108 sq ft and lengths convert to feet.

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.