Offline — the draft stays saved on this device.
HVAC cost calculator

HVAC cost calculator

Floor area, W per area ratio and installed price per kW: you get the capacity needed and total cost with extras.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

30709.275 BTU/h

Net measurement: 30709.275 BTU/h

  • Equipment and installation30709.275 BTU/h · $3,600.00
  • Extras (removal, builder's work, permits)1 unit · $300.00

Indicative estimate: $3,900.00

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labor, margin & tax

How it's calculated (visible formula)

kW = area × W/m² ÷ 1000; cost = kW × installed price per kW + extras

See methodology and formula versions

How to calculate it, step by step

  1. Work out capacity from area and ratio.
  2. Enter your installed price per kW for the system type.
  3. Add extras: removal, carpentry, electrical, permits.
  4. Review total and cost per area.
  5. Add margin and tax on the quote.

Worked example: 970 sq ft home at 100 W/m², $400 per kW

  1. 90 m² × 100 = 9 kW (2.6 tons)
  2. 9 × $400 = $3,600 + $300 extras

→ $3,900 in total (about $1,500 per ton).

Common mistakes

Pro tips

From calculation to quote

Add labor, overhead and your margin, and generate the professional PDF.

FAQs

How much does HVAC cost per ton?
It varies widely by system type and region — enter your installed price.
Is tax included?
Add it with the labor and margin calculator.
Are there rebates?
Heat pumps often qualify for federal tax credits and utility rebates.
Ductless or ducted — which costs more?
Ducted costs more to install but distributes air better.
How much does a heat pump cost installed?
It varies with capacity and distribution; use your price per kW or ton.
What does installed price include?
Equipment, line sets, condensate drain, pad or brackets, start-up and labor.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.