Offline — the draft stays saved on this device.
Log yield calculator

Log yield calculator

Small-end diameter, length, number of logs and sawmill recovery: you get log volume, estimated sawn lumber and board feet, including the Doyle log rule.

Deterministic calculation in your browser. No signup to see the result.

Estimated sawn lumber

0.327 yd³

  • Estimated sawn lumber0.327 yd³
  • Log volume0.654 yd³
  • Board feet (recovery)106.51 bd ft
  • Board feet (Doyle rule)113.2 bd ft

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & VAT

How it's calculated (visible formula)

log = π/4 × D² × L × logs; sawn = log × recovery; Doyle = (D_in − 4)² × L_ft ÷ 16

See methodology and formula versions

How to calculate it, step by step

  1. Measure small-end diameter inside the bark.
  2. Measure log length, less trim allowance.
  3. Work out log volume as a cylinder.
  4. Apply sawmill recovery for the diameter and cutting pattern.
  5. Compare with the Doyle rule if trading in board feet.

Worked example: 15¾ in (40 cm) × 13 ft log, 50% recovery

  1. Log volume ≈ 0.5 m³
  2. × 50% ≈ 0.25 m³ sawn
  3. ≈ 107 bd ft; Doyle ≈ 113 bd ft

→ About 0.25 m³ (107 board feet) of lumber.

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

What recovery does a sawmill get?
About 45–60% depending on diameter, taper and cutting pattern.
What is the Doyle log rule?
A classic US scale for board feet; it under-scales small logs. Scribner and International ¼ are alternatives.
Where do I measure diameter?
At the small end, inside the bark.
What is the Doyle rule?
A US log scale for board feet; it under-scales small logs.
Doyle vs Scribner vs International?
International ¼ in is closest to actual yield; Doyle is most conservative.
How much does lumber shrink when drying?
About 5–10% by volume down to 12% moisture, most of it tangentially.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.