Offline — the draft stays saved on this device.
Concrete cost calculator

Concrete cost calculator

Volume, price per cubic yard or metre, pumping, minimum order and short-load fee: you get the total cost and real price per unit.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

4.12 yd³

Net measurement: 4.12 yd³ · Waste 5 %

  • Ready-mix concrete4.12 yd³ · $299.25
  • Pumping1 unit · $0.00
  • Short-load fee0 unit · $0.00
  • Cost per m³1.308 yd³ · $95.00

Indicative estimate: $299.25

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labor, margin & tax

How it's calculated (visible formula)

cost = volume × (1 + waste) × price + pumping + short-load fee if under the minimum

See methodology and formula versions

How to calculate it, step by step

  1. Work out volume and add waste.
  2. Enter the plant's price per unit.
  3. Add pumping if the truck can't reach.
  4. Check whether the order meets the load minimum.
  5. Review total and cost per unit.

Worked example: 3.9 yd³ (3 m³) at $95/m³, no pump

  1. 3 × 1.05 = 3.15 m³
  2. 3.15 × $95 = $299

→ $299.25.

Common mistakes

Pro tips

From calculation to quote

Add labor, overhead and your margin, and generate the professional PDF.

FAQs

How much is a yard of concrete?
It varies by strength and region — enter your plant's price.
What is a short-load fee?
A charge for ordering below the truck minimum, often 3–6 yd³.
Do I need a pump?
If the truck can't reach the pour, yes.
What mix for a slab?
Often 3,000–4,000 psi; follow the plans.
How much does a pump cost?
A setup fee plus hourly or per yard — get a firm price.
Can I add water on site?
Avoid it — it raises the water-cement ratio and lowers strength.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.