Offline — the draft stays saved on this device.
Roofing cost calculator

Roofing cost calculator

Roof area and your prices for material, labor, tear-off and extras: you get the total cost and cost per area.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

1291.669 ft²

Net measurement: 1291.669 ft²

  • Roofing material1291.669 ft² · $3,000.00
  • Labor1291.669 ft² · $2,400.00
  • Tear-off of existing roof1291.669 ft² · $960.00
  • Extras (scaffold, flashing, dumpster)1 unit · $300.00
  • Cost per m²10.764 ft² · $55.50

Indicative estimate: $6,660.00

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labor, margin & tax

How it's calculated (visible formula)

cost = area × (material + labor + tear-off) + extras

See methodology and formula versions

How to calculate it, step by step

  1. Work out true roof area.
  2. Enter your material, labor and tear-off prices.
  3. Add scaffolding, dumpster and flashing as extras.
  4. Review total and cost per square.
  5. Add margin and tax on the quote.

Worked example: 1,290 sq ft (120 m²) at $25 + $20 + $8 per m², $300 extras

  1. 120 × $53 = $6,360
  2. + $300 = $6,660

→ $6,660 (about $516 per square).

Common mistakes

Pro tips

From calculation to quote

Add labor, overhead and your margin, and generate the professional PDF.

FAQs

How much does a new roof cost per square?
It varies with material and access — enter your prices.
What does tear-off add?
Typically $100–$200 per square depending on layers.
Do I need a permit?
Usually yes for a re-roof — check your building department.
How much does a new roof cost?
It depends on material and deck condition — enter your prices.
Overlay or tear-off?
Tear-off reveals damage and is often required with two layers already.
How long does a re-roof take?
One to three days for a typical house with asphalt shingles.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.