Offline — the draft stays saved on this device.

Architecture: design checks

Accessible ramps, drawing scales, daylight and ventilation, egress width, floor area ratio, occupant load and window-to-wall ratio.

Calculators

What are these checks for?

To validate the parameters that most constrain a design at concept or remodel stage: accessibility, egress, occupant load, daylight and ventilation, floor area ratio and glazing ratio. They show early whether an idea fits the code.

They don't replace design documents: the architect demonstrates code compliance.

Which codes apply in the US?

The IBC and IRC cover egress, occupant load, light and ventilation; the 2010 ADA Standards cover accessibility; zoning ordinances set FAR, lot coverage and setbacks.

Local amendments often add requirements.

How do egress and occupant load work together?

First work out occupant load from area and use; that number sizes doors, corridors and stairs and decides how many exits are needed. With several exits, no single exit may carry more than half the load.

Accessible ramps complete routes where there are level changes.

Prices & Guides

FAQs

What is the maximum ADA ramp slope?
1:12 (8.33%), with a 30 in (760 mm) maximum rise per run.
What is floor area ratio?
Total building floor area divided by lot area; your zoning code sets the maximum.
Do these replace a code review?
No: they're early checks. Your architect or code official confirms compliance.
What is an accessible route?
A step-free path with widths, slopes and surfaces meeting ADA standards.
Where do I find my zoning rules?
On your city or county planning website or by requesting a zoning letter.
What is design occupant load?
The number of people assumed in a space to size egress.

Create quote →