Drywall cost calculator

Drywall cost calculator

Wall area, number of sides and your material and labor prices per area: you get the total cost, cost per area of wall and an approximate board count.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

430.556 ft²

Net measurement: 430.556 ft²

  • Materials (boards, framing, screws, compound)861.113 ft² · $960.00
  • Labor861.113 ft² · $1,440.00
  • Extras1 unit · $0.00
  • Cost per m² of wall10.764 ft² · $60.00
  • 4 × 8 ft boards (approx.)30 board

Indicative estimate: $2,400.00

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

How it's calculated (visible formula)

cost = area × sides × (material + labor) + extras

See methodology and formula versions

How to calculate it, step by step

  1. Measure wall area.
  2. Enter one or two sides.
  3. Enter your material and labor price per area per side.
  4. Add extras: insulation, openings, trim.
  5. Review total and cost per area of wall.

Worked example: 430 sq ft wall, both sides, $12/m² material, $18/m² labor

  1. 80 m² × $12 = $960
  2. 80 m² × $18 = $1,440

→ $2,400 (about $5.60 per sq ft of wall).

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

How much does drywall cost per square foot?
It depends on board type and finish level — use your prices per side.
Does it include taping and mudding?
Include it in your labor rate.
Does it include paint?
No — add it with the paint cost calculator.
How much does an insulated drywall partition cost?
Add insulation to your rate per area and total it here.
What does price per square foot include?
Board, framing, screws, tape, mud and labor.
Is drywall cheaper than plaster?
Usually much faster and cheaper to install.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.