Room size and tile format: you get 12 ft main runners, 4 ft and 2 ft cross tees, wall angle and hanger wires.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

322.917 ft²

Net measurement: 322.917 ft² · Waste 5 %

  • Main runners (12 ft)8 bar
  • 4 ft cross tees44 bar
  • 2 ft cross tees44 bar
  • Wall angle75.787 ft
  • Hanger wires with fittings21 unit

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

How it's calculated (visible formula)

main runners ≈ 0.83 m/m² (every 4 ft); 4 ft tees ≈ 1.39 per m²; 2 ft tees ≈ 1.39 per m² (2×2 only); wall angle = perimeter

See methodology and formula versions

How to calculate it, step by step

  1. Measure the room and draw a centered grid layout.
  2. Install wall angle at finished height with a laser.
  3. Hang main runners every 4 ft.
  4. Add 4 ft cross tees and, for 2×2, 2 ft tees.
  5. Hang wires every 4 ft along each main.

Worked example: 20 × 16 ft room, 2 × 2 tiles

  1. ≈ 30 m² × 0.83 × 1.05 ≈ 26 m → 8 mains
  2. ≈ 44 four-foot tees (and 44 two-foot tees)
  3. Wall angle ≈ 76 ft

→ 8 mains, 44 + 44 tees, 76 ft of angle and 21 hangers.

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

How far apart are main runners?
4 ft on center, parallel to the long wall.
How many hanger wires?
One every 4 ft along each main — about 0.07 per sq ft.
How long is a main runner?
12 ft, with splice ends.
Minimum clearance for a drop ceiling?
At least 3–4 in below joists; more for lights and ducts.
White or black grid?
White is standard; black or colored for design.
Can lights hang from the grid?
Only light fixtures rated for it; heavy fixtures need independent support.