Soil swell calculator

Soil swell calculator

Enter the bank volume and soil type. You get the loose volume to haul and the volume it fills once compacted.

Deterministic calculation in your browser. No signup to see the result.

Loose volume

16.349 yd³

Net measurement: 13.08 yd³ · Waste 25 %

  • Loose volume (swelled)16.349 yd³
  • Compacted volume11.772 yd³
  • Swell factor1.25

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

How it's calculated (visible formula)

loose = bank × (1 + swell); compacted = bank × compaction factor

See methodology and formula versions

How to calculate it, step by step

  1. Work out the bank volume (in place, undisturbed).
  2. Identify the soil: sand, gravel, common earth, clay or rock.
  3. Apply swell for the loose volume that goes on the truck.
  4. Apply the compaction factor for how much it fills once compacted.
  5. Use loose for hauling and compacted for backfill.

Typical factors by soil

Typical factors by soil
SoilSwellCompacted / bank
Sand12%0.95
Gravel12%0.95
Common earth25%0.90
Clay35%0.85
Blasted rock50%1.30

Worked example: 13 yd³ (10 m³) of common earth

  1. 25% swell → 16.3 yd³ loose
  2. Compacted: 13 × 0.90 = 11.8 yd³

→ Haul 16.3 yd³; it backfills 11.8 yd³.

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

What's the difference between swell and shrinkage?
Swell is the increase when dug; shrinkage is the decrease when compacted.
Why does compacted rock take more space?
Broken fragments never fit together as tightly as solid rock.
How do I refine the factor?
Use your geotechnical report or weigh a known load.
What is bank volume?
The volume soil occupies in its natural state, before digging.
Why does clay swell so much?
Digging breaks it into clods with lots of voids between them.
How much does fill compact?
About 10–15% relative to bank volume with good compaction.