Concrete cost calculator
Volume, price per cubic yard or metre, pumping, minimum order and short-load fee: you get the total cost and real price per unit.
Purchase quantity
4.12 yd³
Net measurement: 4.12 yd³ · Waste 5 %
- Ready-mix concrete4.12 yd³ · $299.25
- Pumping1 unit · $0.00
- Short-load fee0 unit · $0.00
- Cost per m³1.308 yd³ · $95.00
Indicative estimate: $299.25
Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →
How it's calculated (visible formula)
cost = volume × (1 + waste) × price + pumping + short-load fee if under the minimum
- Net geometric measurement, no waste.
- Adjustable waste % for cuts and breakage.
- Purchase rounded up to sellable units (boxes, bags, buckets, boards).
How to calculate it, step by step
- Work out volume and add waste.
- Enter the plant's price per unit.
- Add pumping if the truck can't reach.
- Check whether the order meets the load minimum.
- Review total and cost per unit.
Worked example: 3.9 yd³ (3 m³) at $95/m³, no pump
- 3 × 1.05 = 3.15 m³
- 3.15 × $95 = $299
→ $299.25.
Common mistakes
- Forgetting the short-load fee.
- Not asking how much unloading time is included.
- Ordering without about 5% extra.
Pro tips
- Ask how much unloading time is included — waiting is billed.
- Order the exact strength and slump specified.
- Have access and forms ready before the truck arrives.
- Combine pours to avoid short-load fees.
From calculation to quote
Add labour, overhead and your margin, and generate the professional PDF.
FAQs
- How much is a yard of concrete?
- It varies by strength and region — enter your plant's price.
- What is a short-load fee?
- A charge for ordering below the truck minimum, often 3–6 yd³.
- Do I need a pump?
- If the truck can't reach the pour, yes.
- What mix for a slab?
- Often 3,000–4,000 psi; follow the plans.
- How much does a pump cost?
- A setup fee plus hourly or per yard — get a firm price.
- Can I add water on site?
- Avoid it — it raises the water-cement ratio and lowers strength.
Sources and standards