Daylight and ventilation calculator
Room floor area, glazed and openable area and your code percentages: you get your ratios and the minimum openings required.
Glazing ratio
15 %
- Current glazing ratio15 %
- Minimum glazed area2 m²
- Current openable ratio7.5 %
- Minimum openable area1 m²
Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →
How it's calculated (visible formula)
ratio = opening area ÷ floor area; minimum = floor area × required percentage
- Net geometric measurement, no waste.
- Adjustable waste % for cuts and breakage.
- Purchase rounded up to sellable units (boxes, bags, buckets, boards).
How to calculate it, step by step
- Measure room floor area.
- Measure glazed and openable window area.
- Enter the percentages your code requires.
- Compare current ratios with the minimums.
- If short, work out how much opening is missing.
Worked example: 215 sq ft bedroom, 32 sq ft glazing (16 openable)
- Light: 15% (minimum 8–10%)
- Ventilation: 7.5% (minimum 4–5%)
→ Meets both minimums.
Common mistakes
- Counting the frame as glazing.
- Using gross instead of net floor area.
- Forgetting egress window size requirements in bedrooms.
Pro tips
- Measure glass, not the rough opening or frame.
- Openings onto small light wells may not count.
- Skylights count, often with their own rules.
- Pair daylight with shading on south and west faces.
From calculation to quote
Add labour, overhead and your margin, and generate the professional PDF.
FAQs
- What does the IBC require?
- Glazing of at least 8% of floor area and openable area of 4% (IBC 1204/1202).
- Can I use mechanical ventilation instead?
- Yes, the IBC allows mechanical ventilation in lieu of natural.
- Bedroom egress windows?
- IRC R310: 5.7 sq ft net clear opening (5.0 at grade floor).
- Does a patio door count?
- Its glazed area does, if it opens outside.
- What if a room doesn't comply?
- It may not count as a habitable room.
- Are kitchens and baths different?
- Codes usually allow mechanical ventilation instead.
Sources and standards
Maintained by Srikanta M · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.