Gravel cost calculator

Gravel cost calculator

Work out the tons of gravel for your area and depth, then apply your price per ton and the delivery charge.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

1.68 t

Net measurement: 1 m³ · Waste 5 %

  • Gravel1.68 t · ₹50.40
  • Delivery1 trip · ₹60.00

Indicative estimate: ₹110.40

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

Shopping list

What to buy for this calculation. Look up each material at your store.

How it's calculated (visible formula)

tons = volume × (1 + waste) × density; cost = tons × price/ton + delivery

See methodology and formula versions

How to calculate it, step by step

  1. Work out the gravel volume: area times depth.
  2. Apply density to get tons and add waste.
  3. Multiply by your price per ton.
  4. Add delivery or the bulk bag cost.
  5. Add fabric, edging and labor for the final quote.

Worked example: 650 sq ft of gravel at 2 in

  1. 650 sq ft × 2 in ≈ 4 yd³; +5% → 4.2 yd³
  2. 4.2 × 1.35 ≈ 5.7 tons
  3. 5.7 × $30/ton = $171 + $60 delivery

→ About $231.

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

How much does 1,000 sq ft of gravel cost?
At 2 in that's about 8.5 tons: multiply by your quarry price and add delivery.
Does the price include spreading?
Usually not — add labor with the margin calculator.
Gravel or pavers?
Gravel is far cheaper per square foot but needs periodic top-ups.
Is bulk gravel cheaper than bulk bags?
Bulk wins from about 3–4 tons; below that, bags avoid minimum delivery fees.
What goes into a gravel path price per square foot?
Excavation, fabric, base, gravel, edging and labor — material is often the smaller part.
How long does it take to spread gravel?
With a compact loader, hundreds of square feet per hour; by hand much less.