Post hole concrete calculator
Number of posts, hole diameter and depth, and post diameter: you get concrete per hole, bags and drainage gravel for the bottom.
Purchase quantity
0.55 m³
Net measurement: 0.5 m³ · Waste 10 %
- Bags of dry concrete mix47 bag
- Concrete per hole0.05 m³
- Drainage gravel at bottom (4 in)0.07 m³
Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →
How it's calculated (visible formula)
hole = π/4 × (D² − d²) × depth; bags = volume × (1 + waste) ÷ yield per bag
- Net geometric measurement, no waste.
- Adjustable waste % for cuts and breakage.
- Purchase rounded up to sellable units (boxes, bags, buckets, boards).
How to calculate it, step by step
- Enter the number of posts.
- Set hole diameter and depth.
- Subtract the post volume.
- Multiply by holes and add waste.
- Convert to bags with the product's yield.
Worked example: 10 posts of 4 in in 12 × 32 in holes
- ≈ 0.050 m³ (1.8 cu ft) per hole
- × 10 × 1.1 = 0.55 m³
→ About 47 bags of 55 lb (or 33 of 80 lb).
Common mistakes
- Not subtracting the post volume.
- No gravel at the bottom — posts rot.
- Pouring without plumbing and bracing.
Pro tips
- Put 4 in of gravel in the bottom for drainage.
- Plumb and brace the post before pouring.
- Crown the top so water runs away.
- Set wood posts on the gravel, not encased at the bottom.
From calculation to quote
Add labour, overhead and your margin, and generate the professional PDF.
FAQs
- How many bags per post?
- For a 12 × 32 in hole, about 3 bags of 80 lb.
- How deep should posts be?
- One third of the above-ground height, at least 24 in.
- Dry-pour concrete in the hole?
- Works for light posts; mix it for loaded ones.
- What hole size for a 4×4 post?
- About 10–12 in — three times the post width.
- How deep?
- One third of the post's exposed height, at least 24 in.
- Concrete or mortar for posts?
- Concrete — mortar lacks coarse aggregate.
Sources and standards
Maintained by Srikanta M · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.