Offline — the draft stays saved on this device.
Hardwood flooring calculator

Hardwood flooring calculator

Floor area, layout, coverage per box and glue-down or floating: you get square footage with the waste for each pattern, boxes, and adhesive or underlayment.

Deterministic calculation in your browser. No signup to see the result.

Purchase quantity

27 m²

Net measurement: 25 m² · Waste 8 %

  • Boxes of hardwood15 box
  • Hardwood to buy27 m²
  • Underlayment (floating)26.25 m²

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

Shopping list

What to buy for this calculation. Look up each material at your store.

How it's calculated (visible formula)

area = floor × (1 + waste by layout: straight 8%, diagonal 15%, herringbone 20%); boxes = ceil(area ÷ box coverage)

See methodology and formula versions

How to calculate it, step by step

  1. Measure the area.
  2. Choose the layout (straight, diagonal, herringbone) to set waste.
  3. Work out square footage to buy.
  4. Divide by coverage per box.
  5. Add adhesive if glue-down or pad if floating.

Worked example: 270 sq ft straight lay, 19.4 sq ft boxes, floating

  1. 270 × 1.08 ≈ 291 sq ft
  2. 291 ÷ 19.4 = 15 boxes

→ 15 boxes and about 283 sq ft of underlayment.

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

How much extra hardwood should I buy?
8% for straight lays, 15% diagonal, 20% herringbone.
Floating or glue-down?
Floating installs faster; glue-down sounds more solid.
How much adhesive?
About 1–1.2 kg per m² (roughly 1 gal per 40–50 sq ft).
Solid or engineered hardwood?
Engineered is more stable and works over radiant heat; solid can be refinished more.
Hardwood in the kitchen?
Yes, with a tough finish and care with water — engineered is safer.
How many times can hardwood be refinished?
Solid several times; engineered depends on the wear-layer thickness.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.