Offline — the draft stays saved on this device.
Lighting layout calculator

Lighting layout calculator

Room size, target illuminance, lumens per fixture and utilization and maintenance factors: you get how many fixtures, the grid and spacing.

Deterministic calculation in your browser. No signup to see the result.

Fixtures needed

12 unit

Net measurement: 9 unit

  • Light fixtures (full grid)12 unit
  • Total luminous flux needed15000 lm
  • Columns (along length)4 unit
  • Rows (across width)3 unit
  • Spacing along length1.5 m
  • Spacing across width1.33 m

Your prices per language/currency. Used when you enable “Use my prices” in calculators. My prices →

Calculate labour, margin & GST

How it's calculated (visible formula)

Φ = E × area ÷ (CU × LLF); n = ceil(Φ ÷ lumens per fixture); columns ≈ √(n × length ÷ width)

See methodology and formula versions

How to calculate it, step by step

  1. Measure room length and width.
  2. Pick target illuminance for the use.
  3. Enter fixture lumens, utilization and maintenance factors.
  4. Work out total flux and number of fixtures.
  5. Lay them out in a grid with half spacing to the walls.

Worked example: 20 × 13 ft office at 300 lux (28 fc), 1,800 lm fixtures

  1. Φ = 300 × 24 ÷ (0.6 × 0.8) = 15,000 lm
  2. 15,000 ÷ 1,800 = 8.3 → 9
  3. Grid 4 × 3 = 12

→ At least 9 fixtures (12 in a 4 × 3 grid, about 5 × 4.4 ft apart).

Common mistakes

Pro tips

From calculation to quote

Add labour, overhead and your margin, and generate the professional PDF.

FAQs

How many lux per room?
Living room 150–300, kitchen 300–500, office 500 (1 fc ≈ 10.76 lux).
What utilization factor?
0.5–0.7 for medium, light-colored rooms.
How many lumens is a 6 in LED downlight?
About 800–1,200 lm.
How many recessed lights for a 12 × 16 ft room?
About 6–8 at 30 fc with 800 lm fixtures.
What is the maintenance factor?
Light lost over time to dirt and aging (0.7–0.8).
How many foot-candles for a kitchen?
30–50 fc on counters.

Sources and standards

Maintained by · Formula v1.0.0 · Verified 2026-09-10 · Updated 2026-09-10 · Limits: quantity estimation, not structural design or site supervision.